 ====== Cost Calculation ====== ====== Cost Calculation ======
 +
 +**Path:** Main menu: Simulation > Costing\\
 +{{:simulation:iconcalculatekostenrechnung-simulation.ico?nolnk&60x60 |}}
 +\\
 +\\
 +\\  
 +To display the cost calculation in SIGMA (Simulation / Costing) must be clicked. This will open a dialog with three tabs („machine hour rate“, „Costing calculation“ and „Default sizes“). 
 +
 +{{ :en:simulation:en_sigma150_dlg_simulation_011.png?nolink |}}
 +  
 +===== Machine hour rate =====
 +
 +**Path:** Main menu: Simulation > Costing\\
 +{{:simulation:iconcalculatekostenrechnung-simulation.ico?nolnk&60x60 |}}
 +\\
 +\\
 +\\
 +In the „tab machine hour rate“ the acquisition costs of the extruder must be entered. A detailed description of the calculation is given in the reference manual (s. [[en:grundlagenhandbuch:kostenkalkulation#calculation_of_the_machine_hour_rate|Calculation of the Machine Hour Rate]]).
 +{{ :en:simulation:en_sigma150_dlg_simulation_012.png?nolink |}}
 +
 +===== Full cost calculation =====
 +
 +**Path:** Main menu: Simulation > Costing\\
 +{{:simulation:iconcalculatekostenrechnung-simulation.ico?nolnk&60x60 |}}
 +\\
 +\\
 +\\
 +In the second tab „Full cost calculation“ the price of each material in €/kg must be entered. With the input values SIGMA can calculate the machine hour rate and the total costs of one year. A detailed description of the calculation is given in the reference manual (s. [[en:grundlagenhandbuch:kostenkalkulation#full_cost_calculation|Full Cost Calculation]]).
 +{{ :en:simulation:en_sigma150_dlg_simulation_013.png?nolink |}}
 +
 + ===== Specific sizes =====
 +
 +**Path:** Main menu: Simulation > Costing\\
 +{{:simulation:iconcalculatekostenrechnung-simulation.ico?nolnk&60x60 |}}
 +\\
 +\\
 +\\  
 +In the last tab the following predetermined values can be adjusted: 
 +  * Price index, Usual service life
 +  * Total potential, Maintenance time, Batch changing time, Cleaning time, Servicing time
 +  * Interest rate
 +  * Consumable costs, Maintenance costs
 +  * Required space, Price per m²
 +  * Engine efficiency, Gear unit efficiency, Electricity costs, Water costs, Specific energy, Proportion of heating power, Proportion of cooling power
 +  * Overhead costs of sales, Overhead costs of administration, Overhead costs of supplies (material), residual production
 +
 +How these parameters interact an the calculation of the machine hour rate and the full cost calculations word are explained in the reference manual, see the link below.
 +