Unterschiede
Hier werden die Unterschiede zwischen zwei Versionen angezeigt.
| Beide Seiten der vorigen RevisionVorhergehende ÜberarbeitungNächste Überarbeitung | Vorhergehende Überarbeitung | ||
| en:simulation:kostenkalkulation [2026/01/10 21:10] – neelest | en:simulation:kostenkalkulation [2026/04/07 14:25] (aktuell) – [Full cost calculation] pka | ||
|---|---|---|---|
| Zeile 1: | Zeile 1: | ||
| ====== Cost Calculation ====== | ====== Cost Calculation ====== | ||
| - | |||
| - | ===== Cost Calculation ===== | ||
| **Path:** Main menu: Simulation > Costing\\ | **Path:** Main menu: Simulation > Costing\\ | ||
| Zeile 19: | Zeile 17: | ||
| \\ | \\ | ||
| \\ | \\ | ||
| - | In the „tab machine hour rate“ the acquisition costs of the extruder must be entered. | + | In the „tab machine hour rate“ the acquisition costs of the extruder must be entered. A detailed description of the calculation is given in the reference manual (s. [[en: |
| {{ : | {{ : | ||
| Zeile 29: | Zeile 27: | ||
| \\ | \\ | ||
| \\ | \\ | ||
| - | In the second tab „Full cost calculation“ the price of each material in €/kg must be entered. With the input values SIGMA can calculate the machine hour rate and the total costs of one year. | + | In the second tab „Full cost calculation“ the price of each material in €/kg must be entered. With the input values SIGMA can calculate the machine hour rate and the total costs of one year. A detailed description of the calculation is given in the reference manual (s. [[en: |
| {{ : | {{ : | ||
| - | + | ===== Specific sizes ===== | |
| - | + | ||
| + | **Path:** Main menu: Simulation > Costing\\ | ||
| + | {{: | ||
| + | \\ | ||
| + | \\ | ||
| + | \\ | ||
| + | In the last tab the following predetermined values can be adjusted: | ||
| + | * Price index, Usual service life | ||
| + | * Total potential, Maintenance time, Batch changing time, Cleaning time, Servicing time | ||
| + | * Interest rate | ||
| + | * Consumable costs, Maintenance costs | ||
| + | * Required space, Price per m² | ||
| + | * Engine efficiency, Gear unit efficiency, Electricity costs, Water costs, Specific energy, Proportion of heating power, Proportion of cooling power | ||
| + | * Overhead costs of sales, Overhead costs of administration, | ||
| + | How these parameters interact an the calculation of the machine hour rate and the full cost calculations word are explained in the reference manual, see the link below. | ||
| - | + | {{ : | |